

Brief
Remove existing spindles and wooden handrail with glass and a new wooden handrail.
Result
This project was completed in a period of 1 month. The existing wooden railings were removed and a new newel post was installed at the bottom. Then, the handrail was replaced with a new wooden handrail. Next the glass was templated to ensure it would be the correct fit. Finally the Clamps and glass were installed and any finishing touches were completed.